Sign In | Join Free | My xpandrally.com
xpandrally.com
Products
Search by Category
Home > Scaffoldings >

High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

Categories Shoring Scaffolding Systems
Brand Name: ZNLS
Model Number: post shore
Place of Origin: China
MOQ: 25 tons
Price: Negotiation
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Delivery Time: 14 to 21 days after deposit
Packaging Details: In bundle or pallets, or by customer demands
Raw material: Q235 Steel Pipe
Finishing:: Electric Galvanized
Application: Vertical load bearing
Size:: Prop 30-350
Adjustment type: By thread and regulating holes
Auxiliary: Tripod
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

    High Capacity Post Shore of 3.5 m for Supporting Decking Formwork Systems


    The high load capability makes ZNLS props the top choice offering reliability and safety for any construction job.

    Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props, which result in safe and efficient use on sites.

    The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

    Important Instructions:
    • Respect the prop spacing in accordance with the project.

    • Prop load capacities and engineer’s design must be observed.

    • The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

    • Check formwork and prop erection before concrete pouring.

    • Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

    • Avoid the sudden emptying of the concrete bucket onto the formwork.

    • Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

    • Before starting any dismantling operation, check the state of the props.

    • After removal, props should not be irregularly piled up.


    Quality High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading for sale
    Send your message to this supplier
     
    *From:
    *To: ZNLS ENGINEERING CO., LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0