Sign In | Join Free | My xpandrally.com |
|
Categories | CNC Machining Parts |
---|---|
Brand Name: | Customized |
Model Number: | Custom made |
Certification: | IS9001:2016, ISO/TS16949, EICC, and Dun & Bradstreet certification |
Place of Origin: | China |
MOQ: | 5PCS |
Price: | $1.00 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 10,000/month |
Delivery Time: | 10-25 work days |
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom |
Type: | DRILLING, Laser Machining, Milling, Other Machining |
Material Capabilities: | Plastic,Resin,ABS,PP,PA,PC,PE,POM,Acrylic,FR4,Nylon |
Surface treatment: | Anodized/Plating |
Equipment: | 3/4/5 Axis Center Machining |
payment: | Paypal\TT\Western Union\Trade Assurance |
Tolerance: | +/-0.01~+/-0.005mm(depends on your product) |
Drawing Format: | 2D/(PDF/CAD)3D(IGES/STEP) |
Keyword: | Precision CNC Machining |
Application: | Industrial Equipment |
OEM/ODM: | OEM ODM CNC Drilling Milling Machining Service |
OEM Custom 5-axis POM Gear Auto Precision CNC PEEK Part Plastic Machining
Products Description
FAQ:
1.Are you a manufacturer or a trading company?
We are a 30,000-square-meter factory with 30years experience found in 1990 located in Shenzhen China.
2.How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity, surface treatment and tolerance requirement.
3. Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.
4.Will my drawings be divulged?
No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need.
5. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.
6. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production.
7. How do you control the quality?
(1) Material inspection--Check the material surface and roughly dimension.
(2) Production first inspection--To ensure the critical dimension in mass production.
(3) Sampling inspection--Check the quality before sending to the warehouse.
(4) Pre-shipment inspection--100% inspected by QC assistants before shipment.
8. What will you do if we receive poor quality parts?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap
![]() |